Return-Path: <email_13FF1492-833D-4C48-9975-04E654D98A78O@bidmail.com>
Delivered-To: info@sterlingcal.com
Received: from reseller401.webserversystems.com
	by reseller401.webserversystems.com with LMTP
	id 1QE+FHb2AmjrVw4AchKAPA
	(envelope-from <email_13FF1492-833D-4C48-9975-04E654D98A78O@bidmail.com>)
	for <info@sterlingcal.com>; Fri, 18 Apr 2025 20:03:50 -0500
Return-path: <email_13FF1492-833D-4C48-9975-04E654D98A78O@bidmail.com>
Envelope-to: info@sterlingcal.com
Delivery-date: Fri, 18 Apr 2025 20:03:50 -0500
Received: from mail.bidmail.com ([208.97.57.222]:59453)
	by reseller401.webserversystems.com with esmtps  (TLS1.2) tls TLS_ECDHE_RSA_WITH_AES_256_GCM_SHA384
	(Exim 4.98.1)
	(envelope-from <email_13FF1492-833D-4C48-9975-04E654D98A78O@bidmail.com>)
	id 1u5wcX-00000003wSO-3Ilv
	for info@sterlingcal.com;
	Fri, 18 Apr 2025 20:03:50 -0500
DKIM-Signature: a=rsa-sha256; t=1745024615; x=1745629415; s=m1024; d=bidmail.com; c=relaxed/relaxed; v=1; bh=yhRLTRQO9oWjs6FnJLecUwgbMJKPlL1hFIOWFKeSj8Q=; h=From:Subject:Date:Message-ID:To:MIME-Version:Content-Type;
   b=67ugTGehAEKYgMhWt1jVOZ/mgs0g13y1C/sqAPJI7H9JxCJG2Q8bE5/km2A7ZP9taf8OobR/AkhvRCyp2szbXmLeNlAN/lQdjhwUP8Xgcqf3RwqPuibrko8Zi9uMxxwOGBLuuUfDvy/XjPfwa6+43CGMq3iV5XIsTn6gDe4+fvk=
Received: from mail.corp.bidmail.com ([208.97.57.222])
        by mail.bidmail.com (12.2.0 build 2 x64) with ASMTP id 202504181903341539
        for <info@sterlingcal.com>; Fri, 18 Apr 2025 19:03:34 -0600
Subject: Pacific General Contractor Builders, Inc: ITB // AUTO ZONE #9344 BAKERSFIELD CA
X-BIDGUID: 13FF1492-833D-4C48-9975-04E654D98A78
List-Unsubscribe: <mailto: unsubscribe@bidmail.com?subject=unsubscribe%2013FF1492-833D-4C48-9975-04E654D98A78>
Content-Type: multipart/mixed; boundary="----=_NextPart_000342040605ec07e9"
From: "Pacific General Contractor Builders, Inc" <email_13FF1492-833D-4C48-9975-04E654D98A78O@bidmail.com>
To: info@sterlingcal.com
MIME-Version: 1.0
Date: Fri, 18 Apr 2025 19:03:34 -0600
Message-ID: <13d4be43de19b506dabefffc7daaec1c@bidmail.com>
X-Spam-Status: No, score=-4.1
X-Spam-Score: -40
X-Spam-Bar: ----
X-Spam-Flag: NO


------=_NextPart_000342040605ec07e9
Content-Type: multipart/related; boundary="----=_NextPart_000342050605ed07e9"


------=_NextPart_000342050605ed07e9
Content-Type: multipart/alternative; boundary="----=_NextPart_000342060605ee07e9"


------=_NextPart_000342060605ee07e9
Content-Type: text/plain





Invitation To Bid








&nbsp;












Invitation to Bid
AUTO ZONE #9344 BAKERSFIELD CA






&nbsp;








To Sterling Construction Co.  Andrew Sterling (info@sterlingcal.com)  9025 Wilshire Blvd Suite 301 Beverly Hills CA 90211






From Pacific General Contractor Builders, Inc Estimating Department (estimating@pgcbuilders.com) 3811 Wacker Dr Jurupa valley CA 91752 P: (951) 777-9577 F: (951) 351-7783









Message 
								
									
										

Hello,

PGC is requesting bids for the following project. Please submit your bid at your earliest convenience.&nbsp;

Thank you!


										
									
								
								










Documents





Project Files














Bidding? (Click below)




Yes

No

Maybe



 Project
AUTO ZONE #9344 BAKERSFIELD CA
Bid Date/Time
May 05, 2025 03:00 pm
Job Walk Date/Time
 
Location
NWC E. BRUNDAGE & OSWELL BAKERSFIELD CA 93307
Trade(s)
06100 - ROUGH CARPENTRY
Estimator
Estimating Department
Scope/Comments
Fencing, toilets, temp office, Final Clean, Surveying, Demo site, grading, erosion control, pest/termite,&nbsp;asphalt/paving, striping,&nbsp;site utilities&nbsp;(water, fire, sewer, storm, electrical, phone, gas, irrigation), landscaping, concrete (site and building), masonry, structural steel, veneer, rough carpentry, insulation, roofing, sheet metal/corner guards, roof hatch, sheet metal, joint sealant, floor sealer, doors/frames/hardware, overhead door,&nbsp;storefronts, canopy, stucco, metal stud framing, resilient flooring, paint (interior and exterior), FRP, restroom accessories, Fire sprinklers, plumbing, HVAC, electrical, Air balance.

&nbsp;

&nbsp;

Key Notes.

&nbsp;

All trades are required to review&nbsp;all sheets&nbsp;as some information for your trade may be on other sheets not specific to your trade.

&nbsp;

See below additional information required by trades.

&nbsp;

Demo contractor to include:

1. New drive access. This project will require offsite and street work. Include traffic control for demolition work and traffic safety plan.

2. Demo contractor will be responsible for removal of debris in a safe and code compliant manner per city, state and county requirements.

&nbsp;

&nbsp;

Electrical contractor to include:

1.&nbsp;Sheets E-4 through E6 are for the venstar, surveyor and alarm. Please make sure to include all piping, low voltage, and additional items required to be installed by the electrical contractor. Everything on those pages is by the electrical contractor unless noted in the detail.

2.&nbsp;Provide temporary interior work lighting to be included in the proposal.

3. Provide labor and material to install Unistrut bracing for lighting and pipe runs where required.

4. Electrical contractor required to&nbsp;provide&nbsp;and install&nbsp;power poles&nbsp;to cash wraps, sales desks, managers office and all other power pole locations. The power poles can be bought through gray bar (please include them in your pricing).

5. Electrical contractor is responsible for wire from gear to transformer unless provided by utility company.

&nbsp;

&nbsp;

Plumbing contractor to include:

1. Water, sewer and gas will be required on this project, please make sure to include all piping required including any bracing and roofing support. Condensate piping is to be included in pricing draining to mop sink.

2. Please include the roof hydrant and yard hydrant in your proposal.

3. Plumbing contractor is responsible for connection to underground provided 5 feet from building.&nbsp;

&nbsp;

HVAC contractor to include:

1. Please review E sheets 4-6 detailing the required work to complete the HAVC installation of devices. To include low voltage to venstar and surveyor as well as any duct, smoke T-stat and key switches. HVAC contractor will provide and install material and labor for the above-mentioned.

2. HVAC contractor will be responsible for layout of new units.

3. HVAC contractor will provide and install any ducting, grills, wire not provided by AutoZone.

&nbsp;

Underground contractor to include:

1. Please see civil sheets detailing new utilities.

2. Provisions will be made to protect utility lines and services.

3. This project will require street work. Please provide repair of street and traffic control in your proposal for this portion of the work if required.

4. Provide labor and material to install new storm drains. Please refer to civil pages for details.&nbsp;

&nbsp;

Concrete contractor to include:

1. This project contains an offsite drive approach and sidewalks.

2. Please include a traffic control and safety plan for this work.

3. Provide labor and material to install rebar and or mesh as required per structural pages.

4. Provide labor and material to install concrete, finish, saw cut, stego wrap, sand and base as required by structural and soils report.

5. Concrete to include flat work and footings for sidewalks, drive approach, concrete parking, building concrete, trash enclosure slab, switch gear slab, bike rack and monument sign slab as well as all flat work not listed above include offsite slab work where required.

6. Concrete subcontractor is responsible for wash out and removal of excess concrete.

&nbsp;

Masonry contractor to include:

1. Provide labor and material to install block building, trash enclosure, monument sign and any masonry not listed.

2. Provide labor and material to install rebar and mesh where required per structural.

3. Provide labor and material to tool finish the joints between block on interior and exterior.

4. Provide labor and material to grout all CMU where required.

5. Masonry contractor is responsible for wash out and removal of excess grout and CMU debris.

&nbsp;

Asphalt &ndash; Paving contractor to include:

1. There is offsite repair and work on this project. Please include them in your proposal.

2. include traffic control plan and safety plan for offsite and or street work.

3. Asphalt contractor is responsible for removal of excess debris left over from installation.

&nbsp;

Roofing contractor to include:

1. Provide pricing for 60 mil Duralast roofing material per specs.

2. Include insulation board in proposal.

3. Provide and install roof hatch and Bilco handrail access system including ladder up assist attached to steel ladder(by others).

4. Include walk path were required at roof access and HVAC units.

5. Provide copping cape and down spouts.

6. Provide material and labor to install boots for penetrations by others.

&nbsp;

Framing and drywall contractor to include:

1.&nbsp;Installing all aluminum corner guards and access panels (not required by electrical or plumbing) per locations. Corner guards will be provided by PGC.

2.&nbsp;Backing in new walls for shelving, restrooms and drinking fountains. The backing for shelving on existing walls will be 1&rdquo; x 4&rdquo; wood secured to the wall or block wall as required.

3. Black iron or cold rolled steel in new walls per details. Clips to block and existing walls as required.

4. Provide and install 2 x wood material at parapet cap.

5. provide and install all plywood including fire treated plywood above restrooms and phone room.

6. Provide labor and material to frame exterior sign band, including plywood or Densglass as required for stucco/EFIS.

&nbsp;

Painting contractor to include:

1. Provide labor and material to paint pounce pattern (pattern provided by AutoZone)

2. Provide labor and material to paint gas and condensate lines.

3. Include pricing to paint trash enclosure, metal gates and bollards.

4. Provide labor and material to caulk all interior and exterior jambs, block to dry wall, and any connections to paint not listed above.

&nbsp;

Structural Steel contractor to include:

1. Provide labor and material to install owner provided trusses and decking.

2. Provide labor and material to install new beams, columns and any steel not listed as owner provided.

3. Provide labor and material to install exterior handrails. (if required)

4. Provid



















------=_NextPart_000342060605ee07e9
Content-Type: text/html

<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd">
<html xmlns="http://www.w3.org/1999/xhtml">
<head>
<meta content="text/html; charset=utf-8" http-equiv="Content-Type" />
<title>Invitation To Bid</title>
</head>
<body>
<img style="max-width:560px;max-height:100px" src="https://share.bidmail.com/webservices/FilesHandler.ashx?opt=trackEmail&guid=13FF1492-833D-4C48-9975-04E654D98A78&commType=a&image=.png" alt="">
<div marginheight="0" marginwidth="0" style="margin: 0; padding: 0; background-color: #ededed; width: 100%!important; line-height: 100%!important; font-family: Arial;"><center>
<table border="0" cellpadding="0" cellspacing="10" style="margin: 0px; padding: 0px; background-color: #ededed; width: 100%; line-height: 100% !important; height: 100%;">
<tbody>
<tr>
<td align="middle" style="border-collapse: collapse; padding-top: 5px; padding-bottom: 5px;" valign="top">
<p style="margin-bottom: 0; margin: 0;">&nbsp;</p>
<table border="0" cellpadding="0" cellspacing="0" style="border-top: 0px solid transparent; border-radius: 7px; background-color: #ffffff; min-width: 370px;">
<tbody>
<tr>
<td align="center" style="border-collapse: collapse;" valign="top">

<table border="0" cellpadding="0" cellspacing="0" style="margin-left: 10px; margin-right: 10px;">
<tbody>
<tr>
<td style="border-collapse: collapse; background-color: #ffffff;" valign="top">
<div style="color: #505050; font-family: Arial; text-align: left; max-width: 640px !important;">
<div style="width: 100%; background-color: #ffffff; padding-top: 5px; padding-bottom: 5px; margin-top: 10px;">
<div align="center"><img src="https://www.bidmail.com/kbimages/3563295/logo.png" alt="Pacific General Contractor Builders, Inc" />
<h1 style="text-align: center;">Invitation to Bid</h1>
<h2 style="text-align: center; line-height: 164%;">AUTO ZONE #9344 BAKERSFIELD CA</h2>
</div>
</div>
</div>
</td>
</tr>
<tr>
<td style="background-color: #ffffff;">&nbsp;</td>
</tr>
<tr>
<td style="border-collapse: collapse; background-color: #ffffff;" valign="top">
<div style="color: #505050; font-family: Arial; text-align: left; max-width: 640px !important;">
<div style="margin-top: 10px; margin-bottom: 10px;">
<table align="left" cellpadding="0" cellspacing="0" class="msoFix" style="padding-bottom: 10px; width: 310px;">
<tbody>
<tr>
<td style="color: #505050; font-family: Arial; text-align: left;"><strong>To</strong><br /> Sterling Construction Co. <br /> Andrew Sterling (info@sterlingcal.com) <br /> 9025 Wilshire Blvd Suite 301<br /> Beverly Hills CA 90211</td>
</tr>
</tbody>
</table>
<table align="left" cellpadding="0" cellspacing="0" class="msoFix" style="padding-bottom: 10px; width: 310px;">
<tbody>
<tr>
<td style="color: #505050; font-family: Arial; text-align: left;"><strong>From</strong><br /> Pacific General Contractor Builders, Inc<br /> Estimating Department (estimating@pgcbuilders.com)<br /> 3811 Wacker Dr<br /> Jurupa valley CA 91752<br /> P: (951) 777-9577 F: (951) 351-7783</td>
</tr>
</tbody>
</table>
</div>
</div>
</td>
</tr>
<tr>
<td style="border-collapse: collapse; background-color: #ffffff;" valign="top">
<div style="color: #505050; font-family: Arial; text-align: left; max-width: 640px !important;"><hr style="color: #e6e8e6; background-color: #e6e8e6; min-height: 1px; border: 0; margin-top: 5px; margin-bottom: 10px;" /><strong>Message</strong> <!--[if (gte mso 9)|(IE)]>
								<table>
									<tr>
										<td width="600"><![endif]-->
<div style="max-width: 600px;">
<p><p>Hello,</p>

<p>PGC is requesting bids for the following project. Please submit your bid at your earliest convenience.&nbsp;</p>

<p>Thank you!</p></p>
<div></div>
<!--[if mso]></div>
										</td>
									</tr>
								</table>
								<![endif]--></div>
</div>
</td>
</tr>
<tr>
<td style="border-collapse: collapse; background-color: #ffffff;" valign="top">
<div style="color: #505050; font-family: Arial; text-align: left; max-width: 640px !important;"><hr style="color: #e6e8e6; background-color: #e6e8e6; min-height: 1px; border: 0; margin-top: 5px; margin-bottom: 10px;" />
<div style="position: relative; padding: 0px; padding-bottom: 10px;">
<table align="left" cellpadding="0" cellspacing="0" class="msoFix" style="padding-bottom: 10px; width: 310px;">
<tbody>
<tr>
<td style="color: #505050; font-family: Arial; text-align: left;"><strong>Documents</strong></td>
<td style="color: #505050; font-family: Arial; text-align: left;"></td>
<td style="color: #505050; font-family: Arial; text-align: left;">
<table cellpadding="0" cellspacing="0" style="width: 150px;">
<tbody>
<tr>
<td><a href="https://share.bidmail.com/files-inter.aspx?cmd=13FF1492-833D-4C48-9975-04E654D98A78" style="font-size: 16px; font-family: Helvetica, Arial, sans-serif; color: #ffffff; text-decoration: none; border-radius: 3px; -webkit-border-radius: 3px; -moz-border-radius: 3px; background-color: #0033ff; border-top: 7px solid #0033ff; border-bottom: 7px solid #0033ff; border-right: 18px solid #0033ff; border-left: 18px solid #0033ff; display: inline-block;"><strong>Project Files</strong></a></td>
</tr>
</tbody>
</table>
</td>
</tr>
</tbody>
</table>
</div>
</div>
</td>
</tr>
<tr>
<td style="border-collapse: collapse; background-color: #ffffff;" valign="top">
<div style="color: #505050; font-family: Arial; text-align: left; max-width: 640px !important;"><hr style="color: #e6e8e6; background-color: #e6e8e6; min-height: 1px; border: 0; margin-top: 5px; margin-bottom: 10px;" />
<p style="margin: 1em 0; margin-bottom: 16px;"><strong><h2>Bidding? <font color="red">(Click below)</font></h2></strong></p>
<div style="max-width: 640px;">
<table border="0" cellspacing="0" cellpadding="0">
<tbody>
<tr>
<td><a href="https://share.bidmail.com/bid-inter.html?guid=13FF1492-833D-4C48-9975-04E654D98A78&amp;resp=yes" style="font-size: 16px; font-family: Helvetica, Arial, sans-serif; color: #ffffff; text-decoration: none; border-radius: 3px; -webkit-border-radius: 3px; -moz-border-radius: 3px; background-color: #01ca32; border-top: 7px solid #01ca32; border-bottom: 7px solid #01ca32; border-right: 18px solid #01ca32; border-left: 18px solid #01ca32; display: inline-block;"><strong>Yes</strong></a></td>
<td style="width: 5px;"></td>
<td><a href="https://share.bidmail.com/bid-inter.html?guid=13FF1492-833D-4C48-9975-04E654D98A78&amp;resp=no" style="font-size: 16px; font-family: Helvetica, Arial, sans-serif; color: #ffffff; text-decoration: none; border-radius: 3px; -webkit-border-radius: 3px; -moz-border-radius: 3px; background-color: #d62828; border-top: 7px solid #d62828; border-bottom: 7px solid #d62828; border-right: 18px solid #d62828; border-left: 18px solid #d62828; display: inline-block;"><strong>No</strong></a></td>
<td style="width: 5px;"></td>
<td><a href="https://share.bidmail.com/bid-inter.html?guid=13FF1492-833D-4C48-9975-04E654D98A78&amp;resp=maybe" style="font-size: 16px; font-family: Helvetica, Arial, sans-serif; color: #ffffff; text-decoration: none; border-radius: 3px; -webkit-border-radius: 3px; -moz-border-radius: 3px; background-color: #feca63; border-top: 7px solid #feca63; border-bottom: 7px solid #feca63; border-right: 18px solid #feca63; border-left: 18px solid #feca63; display: inline-block;"><strong>Maybe</strong></a></td>
</tr>
</tbody>
</table>
<br /><br /> <strong>Project</strong>
<p style="margin: 1em 0; margin-bottom: 16px;">AUTO ZONE #9344 BAKERSFIELD CA</p>
<strong>Bid Date/Time</strong>
<p style="margin: 1em 0; margin-bottom: 16px;">May 05, 2025 03:00 pm</p>
<strong>Job Walk Date/Time</strong>
<p style="margin: 1em 0; margin-bottom: 16px;"> </p>
<strong>Location</strong>
<p style="margin: 1em 0; margin-bottom: 16px;">NWC E. BRUNDAGE & OSWELL BAKERSFIELD CA 93307</p>
<strong>Trade(s)</strong>
<p style="margin: 1em 0; margin-bottom: 16px;">06100 - ROUGH CARPENTRY</p>
<strong>Estimator</strong>
<p style="margin: 1em 0; margin-bottom: 16px;">Estimating Department</p>
<strong>Scope/Comments</strong>
<p style="margin: 1em 0; margin-bottom: 16px;"><p>Fencing, toilets, temp office, Final Clean, Surveying, Demo site, grading, erosion control, pest/termite,&nbsp;<strong>asphalt/paving</strong>, striping,&nbsp;<strong>site utilities</strong>&nbsp;(<strong>water, fire, sewer, storm, electrical, phone, gas, irrigation</strong>), landscaping, concrete (site and building), masonry, structural steel, veneer, rough carpentry, insulation, roofing, sheet metal/corner guards, roof hatch, sheet metal, joint sealant, floor sealer, doors/frames/hardware, overhead door,&nbsp;<strong>storefronts</strong>, canopy, stucco, metal stud framing, resilient flooring, paint (interior and exterior), FRP, restroom accessories, Fire sprinklers, plumbing, HVAC, electrical, Air balance.</p>

<p>&nbsp;</p>

<p>&nbsp;</p>

<p>Key Notes.</p>

<p>&nbsp;</p>

<p><strong>All trades are required to review&nbsp;<u>all sheets&nbsp;</u>as some information for your trade may be on other sheets not specific to your trade.</strong></p>

<p><strong>&nbsp;</strong></p>

<p><strong>See below additional information required by trades.</strong></p>

<p>&nbsp;</p>

<p><strong>Demo contractor to include:</strong></p>

<p>1. New drive access. This project will require offsite and street work. Include traffic control for demolition work and traffic safety plan.</p>

<p>2. Demo contractor will be responsible for removal of debris in a safe and code compliant manner per city, state and county requirements.</p>

<p>&nbsp;</p>

<p>&nbsp;</p>

<p><strong>Electrical contractor to include:</strong></p>

<p>1.&nbsp;Sheets E-4 through E6 are for the venstar, surveyor and alarm. Please make sure to include all piping, low voltage, and additional items required to be installed by the electrical contractor. Everything on those pages is by the electrical contractor unless noted in the detail.</p>

<p>2.&nbsp;Provide temporary interior work lighting to be included in the proposal.</p>

<p>3. Provide labor and material to install Unistrut bracing for lighting and pipe runs where required.</p>

<p>4. Electrical contractor required to<strong>&nbsp;<u>provide</u></strong>&nbsp;and install&nbsp;<strong>power poles</strong>&nbsp;to cash wraps, sales desks, managers office and all other power pole locations. The power poles can be bought through gray bar (please include them in your pricing).</p>

<p>5. Electrical contractor is responsible for wire from gear to transformer unless provided by utility company.</p>

<p>&nbsp;</p>

<p>&nbsp;</p>

<p><strong>Plumbing contractor to include:</strong></p>

<p>1. Water, sewer and gas will be required on this project, please make sure to include all piping required including any bracing and roofing support. Condensate piping is to be included in pricing draining to mop sink.</p>

<p>2. Please include the roof hydrant and yard hydrant in your proposal.</p>

<p>3. Plumbing contractor is responsible for connection to underground provided 5 feet from building.&nbsp;</p>

<p>&nbsp;</p>

<p><strong>HVAC contractor to include:</strong></p>

<p>1. Please review E sheets 4-6 detailing the required work to complete the HAVC installation of devices. To include low voltage to venstar and surveyor as well as any duct, smoke T-stat and key switches. HVAC contractor will provide and install material and labor for the above-mentioned.</p>

<p>2. HVAC contractor will be responsible for layout of new units.</p>

<p>3. HVAC contractor will provide and install any ducting, grills, wire not provided by AutoZone.</p>

<p>&nbsp;</p>

<p><strong>Underground contractor to include:</strong></p>

<p>1. Please see civil sheets detailing new utilities.</p>

<p>2. Provisions will be made to protect utility lines and services.</p>

<p>3. This project will require street work. Please provide repair of street and traffic control in your proposal for this portion of the work if required.</p>

<p>4. Provide labor and material to install new storm drains. Please refer to civil pages for details.&nbsp;</p>

<p>&nbsp;</p>

<p><strong>Concrete contractor to include:</strong></p>

<p>1. This project contains an offsite drive approach and sidewalks.</p>

<p>2. Please include a traffic control and safety plan for this work.</p>

<p>3. Provide labor and material to install rebar and or mesh as required per structural pages.</p>

<p>4. Provide labor and material to install concrete, finish, saw cut, stego wrap, sand and base as required by structural and soils report.</p>

<p>5. Concrete to include flat work and footings for sidewalks, drive approach, concrete parking, building concrete, trash enclosure slab, switch gear slab, bike rack and monument sign slab as well as all flat work not listed above include offsite slab work where required.</p>

<p>6. Concrete subcontractor is responsible for wash out and removal of excess concrete.</p>

<p>&nbsp;</p>

<p><strong>Masonry contractor to include:</strong></p>

<p>1. Provide labor and material to install block building, trash enclosure, monument sign and any masonry not listed.</p>

<p>2. Provide labor and material to install rebar and mesh where required per structural.</p>

<p>3. Provide labor and material to tool finish the joints between block on interior and exterior.</p>

<p>4. Provide labor and material to grout all CMU where required.</p>

<p>5. Masonry contractor is responsible for wash out and removal of excess grout and CMU debris.</p>

<p>&nbsp;</p>

<p><strong>Asphalt &ndash; Paving contractor to include:</strong></p>

<p>1. There is offsite repair and work on this project. Please include them in your proposal.</p>

<p>2. include traffic control plan and safety plan for offsite and or street work.</p>

<p>3. Asphalt contractor is responsible for removal of excess debris left over from installation.</p>

<p>&nbsp;</p>

<p><strong>Roofing contractor to include:</strong></p>

<p>1. Provide pricing for 60 mil Duralast roofing material per specs.</p>

<p>2. Include insulation board in proposal.</p>

<p>3. Provide and install roof hatch and Bilco handrail access system including ladder up assist attached to steel ladder(by others).</p>

<p>4. Include walk path were required at roof access and HVAC units.</p>

<p>5. Provide copping cape and down spouts.</p>

<p>6. Provide material and labor to install boots for penetrations by others.</p>

<p>&nbsp;</p>

<p><strong>Framing and drywall contractor to include:</strong></p>

<p>1.&nbsp;Installing all aluminum corner guards and access panels (not required by electrical or plumbing) per locations. Corner guards will be provided by PGC.</p>

<p>2.&nbsp;Backing in new walls for shelving, restrooms and drinking fountains. The backing for shelving on existing walls will be 1&rdquo; x 4&rdquo; wood secured to the wall or block wall as required.</p>

<p>3. Black iron or cold rolled steel in new walls per details. Clips to block and existing walls as required.</p>

<p>4. Provide and install 2 x wood material at parapet cap.</p>

<p>5. provide and install all plywood including fire treated plywood above restrooms and phone room.</p>

<p>6. Provide labor and material to frame exterior sign band, including plywood or Densglass as required for stucco/EFIS.</p>

<p>&nbsp;</p>

<p><strong>Painting contractor to include:</strong></p>

<p>1. Provide labor and material to paint pounce pattern (pattern provided by AutoZone)</p>

<p>2. Provide labor and material to paint gas and condensate lines.</p>

<p>3. Include pricing to paint trash enclosure, metal gates and bollards.</p>

<p>4. Provide labor and material to caulk all interior and exterior jambs, block to dry wall, and any connections to paint not listed above.</p>

<p>&nbsp;</p>

<p><strong>Structural Steel contractor to include:</strong></p>

<p>1. Provide labor and material to install owner provided trusses and decking.</p>

<p>2. Provide labor and material to install new beams, columns and any steel not listed as owner provided.</p>

<p>3. Provide labor and material to install exterior handrails. (if required)</p>

<p>4. Provid</p>
</div>
</div>
</td>
</tr>
</tbody>
</table>
</td>
</tr>
</tbody>
</table>
</td>
</tr>
</tbody>
</table>
</center></div>
<br />
</body>
</html>

------=_NextPart_000342060605ee07e9--

------=_NextPart_000342050605ed07e9--

------=_NextPart_000342040605ec07e9--
